Saturday, March 26, 2005

Mounted punch down block cluster



Rewired the phone system, so far we are only utilizing 2 runs (one to Max's office & the other to BGE's office) a temporary line runs to the floor where the DSL & router equiptment is keep on the floor, in a makeshift plastic box/protection unit.

The router equptment will be relocated to the oppsing wall in the wiring closet. Eventually 130 runs of phone line will be routed from this point, with the capacity of 27 phone numbers.

No comments: